Online Stars

Australia's digital talent.

Platform craft

Understanding when to cut a project shorter

Launch library · evergreen read

Photo: Frances Ring and Thomas Meighan Studio Light Magazine 1921 by C. Heighton Monroe (Public domain), via Openverse

Not every idea deserves the runtime originally planned for it, and recognising when a piece has said everything genuinely worth saying, well before it reaches its intended length, is a genuinely valuable editing instinct worth developing deliberately over time, a habit worth building sooner rather than later, which becomes second nature after enough repetition.

Cutting a project shorter than first planned is not a failure of the original idea, and it often reflects the exact opposite, a clear sign that the idea was communicated efficiently without any unnecessary padding weighing it down, which tends to matter more than it first seems.

Ask honestly whether each remaining section genuinely earns its place before publishing, since a shorter, tighter piece that respects a viewer's time generally outperforms a longer one padded out purely to hit an arbitrary target length, especially once the work starts to feel routine, even for creators who have been at this for years.

Back to the library

Share

Sharing opens the network in a new tab. No tracking scripts are loaded on this page.

Printed from Online Stars. Sources for this article are listed at the end of the page.